top of page

One Utah Center

Salt Lake City, UT

LOCATION:

COMPLETION DATE:

1991

PROJECT SIZE:

105,000 SF

MATERIALS:

Sunset Red Granite

Although this building was originally designed with a precast/GFRC cladding, KEPCO+ submitted a design-assist alternative proposing the use of natural stone. The alternate proposal was accepted as it was competitive and the owners believed it would enhance the marketing and long term value of the building. A galvanized stud truss system was used to install the 105,000 SF of Sunset Red granite.

bottom of page