KEPCO+ Logo


 
1311166306311.jpg
click image to enlarge
1 of 6
kepco_btn_prevkepco_btndividerkepco_btn_next
Gateway Tower West
Salt Lake City, UT
Through the design-assist process, KEPCO+ was able to coordinate with the curtainwall contractor, resulting in a fully engineered, completely integrated exterior skin.  At the conclusion of the design-assist phase, a performance mock-up test of the building envelope system was conducted, providing the building owner with confidence that the integrated system would perform to expectation. A total of eleven hundred panels clad with over 75,000 SF of Texas Pearl Granite adorn the exterior of this 24 story high-rise office building in downtown Salt Lake City, Utah.
Gateway Tower West
Salt Lake City, UT

Bennett Federal Building
Salt Lake City, UT

Disney Corp. Headquarters
Burbank, CA

Cottonwood Corporate Center
Salt Lake City, UT

BAC Plaza
Stockton, CA

Hahn Tower
La Jolla, CA

400 Castro
Mountain View, CA

© KEPCO+  |  Photo Credits  |  View Flash Brochure  |  About Us  |  Home