KEPCO+ Logo


 
111166305372.jpg
click image to enlarge
1 of 8
kepco_btn_prevkepco_btndividerkepco_btn_next
Capitol Expansion Buildings
Salt Lake City, UT
Approximately 102,000 SF of Gris Alcazars Granite was installed on this ornate two building addition to the Utah State Capitol Campus.  Despite the project's classical architecture, KEPCO+ was able to panelize approximately two thirds of the exterior cladding, with the bottom third handset.  A design-assist project, KEPCO+'s preconstruction team worked closely with the architects to finalize attachment methods and details for each area of the stone façade, ensuring that adequate “constructability” was achieved without sacrificing architectural detail and while remaining within the budget guidelines.
Utah State Capitol Podium
Salt Lake City, UT

Capitol Expansion Buildings
Salt Lake City, UT

Capitol Terra Cotta Restoration
Salt Lake City, UT

Bennett Federal Building
Salt Lake City, UT

© KEPCO+  |  Photo Credits  |  View Flash Brochure  |  About Us  |  Home